Loose Patio Slab

The Ombudsman reviewed the available evidence and did not find that the developer had breached the Code. However, the Ombudsman was not satisfied that the developer had treated the customer fairly. 

The customer’s photographs showed cracking and damage to a small section of joint filler but did not demonstrate that the slab was uneven or unstable. The joint compound manufacturer later confirmed that the likely cause was ground movement. 

Although the developer responded to the complaint in a timely manner, they failed to visit the property to discuss the customer’s concerns or provide consistent explanations. The expected cause of the issue shifted from shrinkage to ground movement, and the manufacturer was only contacted after the customer had made a referral to the New Homes Ombudsman. As a result, the complaint was not managed in line with the Code.

Learnings